Skip to content

Track an asset's usage

Who can do this
  • Owner
  • Organization admin
  • Concierge
  • Estate admin
  • Estate viewer
  • Web and mobile

Track usage makes a task in progress on an asset reserve it. While the task runs, the asset reads Unavailable on the calendar, on the owners’ home and on the Availability page, with the task’s name as the reason. Use it for the things that go out of use while someone works on them: the car during an oil change, the mower while it is serviced, the boat while it is being winterized. Nobody types a block, and nobody has to remove one: completing, skipping or stopping the task frees the asset.

An estate itself is never reserved by a task, so the setting is off and locked on an estate.

New assets of a class start with the class’s setting. The Vehicle class starts with it on in a new organization; the others start with it off.

  1. Go to Settings > Asset classes and open a class, or select Add class.

  2. Under Capabilities, turn on Track usage.

  3. Save the class.

Changing a class does not change assets that already exist.

  1. Open the asset’s sheet from the estate’s Manual (View all on its overview’s Assets panel) and select Edit.

  2. Under Setup, open Capabilities and tick Track usage.

  3. Select Save changes.

Any open task can be started, from its ⋯ menu. A task reserves the asset it is on, and any estate asset with Track usage among what the task needs; a task with nothing to reserve just carries the In progress chip. To have a task reserve an asset it is not on - the truck for a dump run - add the asset under the task’s Needs: the picker lists the estate’s Track usage assets beside your equipment.

A task that reserves something is meant to be started before it is ticked off, so its row leads with a Start (play) button where the tick usually is. Once the task is under way, the tick takes its place.

  1. On the visit checklist, on the estate’s Tasks tab, on All tasks or on your home’s My tasks panel, select the row’s Start button, or Start task from its ⋯ menu. On the phone, open the task’s details and select Start task.

  2. The row gets an In progress chip that names who started it, and the tick returns in the button’s place.

  3. When the work is done, complete or skip the task as usual. To free the asset without finishing, select Stop task from the ⋯ menu.

  • The task moves to the top of every task list - the visit checklist, the estate’s Tasks tab, All tasks and your home’s My tasks panel - whatever the sort, and stays there until it is done or stopped. On the visit checklist and All tasks, an In progress badge beside My tasks lists only the tasks under way.
  • On the calendar the reservation is drawn like a block, from the day the task was started through today, and opens to In progress with the task’s name. It has no Edit or Remove: it ends with the task.
  • On the owners’ home the asset’s chip reads in use, and on the Availability page its card reads Unavailable with the task’s name, who started it and Until the task is done instead of a return date.
  • When staff book or move a visit onto the estate, the warning lists the reservation under In progress.
  • Staff can still block out time over a task’s reservation, as a wider block may sit over a narrower one.
  • Turning Track usage off on the asset ends its reservation at once; the task stays in progress.