Track an asset's readings
- Owner
- Organization admin
- Concierge
- Estate admin
Track attributes turns an asset’s number and date fields, such as a car’s mileage or its next inspection, into readings. A reading has its own Update button on the asset’s sheet. Each time a task on the asset is completed, the number readings at that moment are saved with it. That lets a task repeat by usage: “every 5,000 mi”, or “every 5,000 mi or 6 months, whichever comes first”. A date reading lets a task come up ahead of that date, such as “30 days before the inspection is due”.
Turn it on for a class
Section titled “Turn it on for a class”The Vehicle class starts with it on, with Mileage and Engine hours as readings.
-
Go to Settings > Asset classes and open a class, or select Add class.
-
Under Capabilities, turn on Track attributes.
-
Under Attribute fields, make sure the class has at least one field of type Number or Date. Each field has a Track checkbox, on by default. Clear it for any number or date field that shouldn’t be a reading. Text and yes/no fields can’t be tracked, so their checkbox is greyed out.
-
Save the class.
Clearing Track on a field takes it off the Readings card and out of the choices for new conditions. The field stays on the asset’s details.
New assets of the class start with the capability on. Changing a class does not change assets that already exist. To turn it on for one of those, open the asset’s sheet, select Edit, and under Setup > Capabilities turn on Track attributes.
Update a reading
Section titled “Update a reading”-
Open the asset’s sheet from the estate’s Manual (View all on its overview’s Assets panel).
-
Under Readings, select Update beside the reading.
-
For a number, type the new value, or use the +100, +500 and similar buttons to add to it, then select Save. For a date, pick the day; it saves straight away.
On a visit, select the asset in the Assets panel: a Readings panel above its tasks has the same Update buttons, so the odometer can be logged while you’re standing beside it. Anyone working the visit can update readings there, including a concierge assigned to just that visit.
You can also enter number readings when you complete a task on the asset. The Complete Task dialog shows them under Readings at completion, filled in with the current values.
Repeat a task by usage
Section titled “Repeat a task by usage”-
On the asset’s sheet, under Tasks, select Add task. Type what needs doing, choose Repeats, and select Next.
-
By readings or dates is already picked, because the asset tracks readings. Each condition reads as a sentence. Pick what to watch, then the amount:
- a number reading: Odometer goes up by 5,000 mi;
- a length of time: Time passes 6 months;
- a date reading, or the asset’s Warranty end: Warranty end is 30 days away. Set it to 0 for the day itself.
Select Add another for a second condition. With two or more, choose Whichever comes first or Only when all are met. The line under the conditions says in plain words when the task will come up.
-
Under When was it last done?, leave Not sure and the task comes up on the next visit, unless its only conditions are dates. If you know, choose I know and set the date and the readings at that time.
-
Select Next to choose who does it and the priority and size, then Add task. Or select Add with defaults to skip that step: the estate concierge does it, at Normal priority.
You can also start from anywhere else you add a repeating task: New Task on the Tasks page or the calendar, or Add task on a visit or the estate’s Tasks tab. Choose Repeats, pick the asset under Where, and the same schedule and conditions are there.
In the Task library, a task template whose Which assets get it? is a class with Track attributes on can use that class’s tracked readings the same way. A template without a class can use time and Warranty end conditions only.
Warranty end is there on every asset, whether or not it tracks attributes. It reads the warranty date on the asset’s details.
What happens next
Section titled “What happens next”- The day its conditions are met, the task appears on the Tasks page and in the assignee’s My Tasks, without waiting for a visit to be prepared. It also shows on the next visit. It is measured from the last time it was completed or skipped. Completing it, on a visit or from the Tasks page, saves the readings, which starts the count again.
- The Readings card lists each of these tasks with how far along it is, for example “3,210 of 5,000 mi · or by Jul 10, 2026”, and marks the ones due on the next visit.
- A date condition comes up once its day arrives, and stays quiet after the task is done. When the date moves later, for example a renewed warranty, it comes up again ahead of the new date. A year-only date counts as December 31.
- If a task has never been done and was added with Not sure, it comes up on the next visit, unless its only conditions are dates.

